Mainland DED license — not a free zone
Companies here hold Dubai DED (mainland) trade licenses, not free-zone licenses. You get direct UAE market access but not free-zone benefits (100% foreign ownership by default, ring-fenced jurisdiction, 0% tax QFZP eligibility). Costs shown are DED license fees; compare with care against free-zone options.
Dubai Industrial City
Saih Shuaib / Dubai South corridor, between Sheikh Mohammed bin Zayed Road (E311) and Emirates Road (E611), near Al Maktoum International Airport · Est. 2004 · Licensing: Dubai Department of Economy and Tourism (DED/DET); fit-out/building permits: Dubai Development Authority; district operator: Dubai Industrial City LLC (TECOM Group PJSC)
Light-to-medium manufacturers, food processors and logistics operators that need industrial land, warehouses and worker housing near Jebel Ali/Al Maktoum corridors AND want mainland UAE market access through a DED license.
Businesses seeking 0% free-zone corporate tax, VAT designated-zone goods treatment, flexi-desk entry packages or freelance permits; also a poor fit for non-industrial service startups that do not need a facility.
01Capability profile
02Where Dubai Industrial City sits
Dubai Industrial City: 96th percentile (AED 2,740) · Licence + registration, AED.
Dubai Industrial City: 4th percentile (30 days) · Total estimated days from application to operational.
Dubai Industrial City: 83th percentile (200 visas) · Absolute maximum visa allocation. Values above 500 clipped to the right edge so the bulk of the distribution stays readable.
Dubai Industrial City: Moderate · Corporate bank account opening difficulty. Each cell is one zone.
03Costs
- Base licence
- AED 2,000
- Registration
- AED 740
- Renewal (year 2+)
- AED 2,000
- 3-year total
- AED 6,740
- 2-year visa cost
- AED 2,300
- Establishment card
- AED 650
- Cancellation fee
- AED 1,020
- Visa renewal
- AED 3,000
- Visa cancellation
- AED 380
- Emirates ID (per visa)
- AED 370
- Dependent / spouse visa
- AED 2,000
Notify me if fees change — get an email if Dubai Industrial City updates its licence or setup costs.
No spam. Unsubscribe anytime. Only emails you when costs change.
04Visas & workspace
- Maximum visas
- 200
- Flexi-desk cap
- 2
- Office cap
- 3
- Family sponsorship
- Available
- Freelancer permit
- Not available
- Golden visa
- Available
- Green visa
- Available
- Medical required
- Yes
- Processing time
- ~7 days
- Virtual office
- No
- Flexi-desk
- No
- Coworking
- Yes
- Dedicated office
- Yes
- Executive office
- No
- Warehouse
- Yes
- Industrial unit
- Yes
- Land plot
- Yes
- Ejari issued
- Yes
- Parking
- Yes
- Dedicated office cost
- AED 14,500/yr
05Banking & setup
- Difficulty
- Moderate
- Time to account
- ~14 days
- Minimum deposit
- AED 25,000
- Corp tax rate
- 9%
- Audit cost (est)
- AED 8,000
- UBO filing
- Required
- AML / KYC
- standard
- Registration modeFully online — no in-person visit required
- Documents & applicationPassport, visa, business plan — ~3–5 days
- Licence issued~5 business days after submission
- Bank account activeAdditional ~14 days · Moderate banking
- OperationalTypically ~30 days, up to ~120 days
06Package pricing
All figures in AED, from official fee schedules. Visa and health-insurance costs are additional.
| Package | Visas | Year 1 | Renewal |
|---|---|---|---|
| Warehouse Unit 500sqm – 5 VisasBest value | 5 | AED 45,000 | AED 36,000 |
| Light Industrial Unit 1000sqm – 10 Visas | 10 | AED 78,000 | AED 62,000 |
| Factory Plot – Manufacturing – 20 Visas | 20 | AED 135,000 | AED 108,000 |
07Permitted activities
Sector-specific manufacturing zones
logistics hub with proximity to Jebel Ali Port
Al Maktoum International Airport
and Etihad Rail freight terminal
08Jurisdiction & ecosystem
This zone offers physical-office options sufficient for a standard QFZP substance posture, though the bar still applies at the entity level (CTGFZP1).
Focus: manufacturing, logistics
Unilever; A.P. Moller-Maersk; Patchi; Al Barakah Dates; Al Ghurair; Bentley; Standard Carpets; Assent Steel Industries; ALAS Emirates Ready Mix; Pure Ice Cream (AED 80M facility under construction 2025); MD Pharma (AED 130M); OZON Pharmaceuticals (AED 293M); Silver Line Gate Group (AED 200M); Al Khayyat Investments; Dubatt Battery Recycling; Neelkanth Cables
QFZP, audit, mainland-permit and substance values are sourced where the zone authority or FTA publishes them, and inferred from published zone characteristics otherwise. How we determine these values.
09Strengths & limitations
- Mainland DED license inside an industrial district: direct UAE-wide sales with no distributor, unlike free-zone alternatives
- Purpose-built industrial ecosystem: six sector zones, warehouses from 5,132 sq ft, land to 5M+ sq ft, 800 MW power, on-site workers' accommodation
- Strategic freight connectivity: Etihad Rail freight terminal on-site, near Jebel Ali Port and Al Maktoum International Airport
- Institutional operator: TECOM Group (DFM-listed) investing heavily - AED 1.6B land acquisition 2025, 97-98% occupancy
- EDB and Emirates Growth Fund financing channels dedicated to DIC manufacturers
- No free-zone tax status: standard 9% corporate tax and standard VAT (not a designated zone) - kills the 'free zone' assumption in much third-party marketing
- No published pricing: license, land and warehouse costs only via inquiry; industrial setup total easily AED 100k-500k+ year 1 with facility and approvals
- Heavy external approval load for manufacturing (MOIAT, municipality, civil defence, DEWA) extends timelines to 1-4 months
- Remote location with limited lifestyle amenities; workers' accommodation currently male-only
Not ideal for: Businesses seeking 0% free-zone corporate tax, VAT designated-zone goods treatment, flexi-desk entry packages or freelance permits; also a poor fit for non-industrial service startups that do not need a facility.
10Recent developments
- 2025-Q2Dubai Industrial City launched a dedicated Food and Beverage Manufacturing Cluster with shared production halls, halal-certified processing facilities, and cold chain warehousing, targeting F&B startups and regional food producers.
- 2024-Q3Dubai Industrial City announced the first Etihad Rail freight terminal directly connecting the zone to the national rail network, enabling cost-efficient cargo movement between Dubai and Abu Dhabi for industrial tenants.
11Tax considerations
Does your planned revenue qualify under the QFZP qualifying-income rules?
QFZP 0% only applies to qualifying income. Mainland trading or revenue from non-free-zone clients is generally non-qualifying and taxed at 9%.
Will you need audited accounts even if this zone doesn't require them?
FTA corporate-tax filing typically expects audited accounts for revenue above AED 50M, and banks often request them at much lower thresholds.
How much of your revenue will come from mainland UAE customers, and how does that affect QFZP and 5% VAT obligations?
Mainland revenue beyond ad-hoc levels can disqualify QFZP and triggers full 9% corporate tax plus standard VAT on supplies.
Do any of your customers, suppliers, or shareholders meet the FTA's related-party definition?
Related-party transactions need transfer-pricing documentation and may push otherwise-qualifying income into the 9% bracket.
These prompts are due-diligence questions, not tax advice. Confirm every answer with a UAE-licensed tax advisor before incorporating.
12Frequently asked
13Similar zones in Dubai
14About this data
Dubai Industrial City data is sourced from official zone authority publications, government fee schedules, and where available, verified against direct communications with the zone. All figures in AED.
- Location
- Saih Shuaib / Dubai South corridor, between Sheikh Mohammed bin Zayed Road (E311) and Emirates Road (E611), near Al Maktoum International Airport
- Established
- 2004
- Authority
- Licensing: Dubai Department of Economy and Tourism (DED/DET); fit-out/building permits: Dubai Development Authority; district operator: Dubai Industrial City LLC (TECOM Group PJSC)
- Last verified
- 2026-07-18
- Confidence
- high
- Methodology
- How we score →
- QFZP eligibility (0% corporate tax)Secondary · 2026-07-18Primary source ↗
- Audit requirementSecondary · 2026-07-18Primary source ↗
- Economic substanceSecondary · 2026-07-18Primary source ↗
- Mainland trading permitSecondary · 2026-07-18Primary source ↗
15Founder reviews
Founder reviews
No founder reviews yet for Dubai Industrial City. Be the first to share your experience.
Not sure if Dubai Industrial City is the right fit?
Complex situations — holding structures, regulated activities, multi-jurisdiction setups — benefit from a 20-minute call with a specialist. No commitment required.
At-a-glance metrics, strengths, trade-offs, partner banks, and a setup checklist for Dubai Industrial City. We email a download link to your inbox.
We use your email only to send this report and a short follow-up sequence. Unsubscribe anytime.